| 1 | Pendampingan Penentuan Industri Unggulan Dan Program Pembangunan Industri Kabupaten Solok | Warta Pengabdian Andalas 30 (2), 370-378, 2023 | 2 |
| 2 | Evaluasi Risiko Terhadap Potensi Gempa Bumi Dan Tsunami Di Rsup Dr. M. Djamil Padang | Prosiding Seminar Nasional Teknik Industri (SENASTI) 1, 1028-1035, 2023 | 1 |
| 3 | Pengaruh Kualitas Layanan Terhadap Kepuasan Mahasiswa Dengan Moderasi Budaya Organisasi Dan Reputasi | Jurnal Rekayasa Sistem Industri 10 (2), 121-130, 2021 | 18 |
| 4 | Perbaikan Sistem Kerja Pada Stasiun Kerja Pengelasan Thresher Dan Pengelasan Lantai Hydrotiller Di Cv Citra Dragon | Universitas Andalas, 2021 | 0 |
| 5 | Prioritizing Design Requirements On Traditional Arrow Using Quality Function Deployment | AIP Conference Proceedings 2227 (1), 2020 | 0 |
| 6 | Designing Iso / Iec 17025: 2017 – Based Laboratory Quality Manual : A Case Of Laboratory Of Environmental Engineering In Andalas University | INTERNATIONAL JOURNAL OF PROGRESSIVE SCIENCES AND TECHNOLOGIES 19 (1), 14-21, 2020 | 3 |
| 7 | An Evaluation On Dr. M. Djamil Hospital Padang Parking Lot Capacity | IOP Conference Series: Materials Science and Engineering 602 (1), 012038, 2019 | 1 |
| 8 | Pelatihan Standar Penanganan Pangan Rendang Di Sentra Produksi Randang | Warta Pengabdian Andalas 26 (2), 112-116, 2019 | 0 |
| 9 | Automatic Precedence Constraint Generation For Assembly Sequence Planning Using A Three-dimensional Solid Model | International Journal of technology 10 (2), 339-350, 2019 | 19 |
| 10 | Automatic Precedence Constraint Generation For Assembly Sequence Planning Using A Three-dimensional Solid Model. | International Journal of Technology 10 (2), 2019 | 0 |
| 11 | Yasrin, Dan F | Afrinaldi,“An evaluation on Dr. M. Djamil Hospital Padang parking lot …, 2019 | 2 |
| 12 | A Framework For The Development Of Automatic Dfa Method To Minimize The Number Of Components And Assembly Reorientations | IOP Conference Series: Materials Science and Engineering 319 (1), 012083, 2018 | 3 |
| 13 | Key Performance Indicators Of Disaster Preparedness: A Case Study Of A Tsunami Disaster | MATEC web of conferences 229, 01010, 2018 | 24 |
| 14 | Using Grey-fuzzy Programming Approach To Solve Multi-objective Supplier Selection Problem | 2017 4th International Conference on Industrial Engineering and Applications …, 2017 | 2 |
| 15 | Last Mile Distribution In Relief Distribution Planning For Responding A Probable Tsunami Reinny | Proceedings of ICoChEA (International Conference On Chemistry And …, 2017 | 0 |
| 16 | Alfadhlani; Kamil, I. Using Grey-fuzzy Programming Approach To Solve Multi-objective Supplier Selection Problem | Proceedings of the 2017 4th International Conference on Industrial …, 2017 | 2 |
| 17 | Perbaikan Rancangan Kruk Ketiak Untuk Penderita Cedera Dan Cacat Kaki | Jurnal Optimasi Sistem Industri 12, 400-410, 2013 | 25 |
| 18 | A Methodology To Evaluate Construction Project Using The Concept Of Lean Construction | International Conference on Construction Industry, Facilities and Asset …, 2012 | 0 |
| 19 | Model Penilaian Kinerja Green Supply Chain Management Terintegrasi Untuk Industri Crumbrubber Di Kota Padang | the 1st Technogy Industry Entrepreneurship Conference, 237 – 247, 2012 | 0 |
| 20 | Penentuan Lokasi Gudang Kesiapsiagaan Bencana Tsunami Di Kabupaten Pesisir Selatan | the 1st Technogy Industry Entrepreneurship Conference, 227 -235, 2012 | 0 |
| 21 | Automatic Collision Detection For Assembly Sequence Planning Using A Three-dimensional Solid Model | Journal of Advanced Manufacturing Systems 10 (02), 277-291, 2011 | 52 |
| 22 | Penentuan Urutan Perakitan Produk Multiaksial Ortogonal Dengan Mempertimbangkan Titik Lokasi Mating Dan Volume Komponen | Jurnal Teknik Industri: Jurnal Keilmuan dan Aplikasi Teknik Industri 10 (2Â …, 2008 | 8 |
| 23 | Pembentukan Urutan Perakitan Produk Dengan Input Gambar Solid 3d | Seminar Sistem Produksi VII, 1-13, 2005 | 0 |
| 24 | Automatic Precedence Constraint Generation For Assembly Sequence Planning Using A Three-dimensional Solid Model | - | 0 |
| 25 | Anas; Toha, Isa Setiasyah; Samadhi, Tma Ari, 2019. Automatic Precedence Constraint Generation For Assembly Sequence Planning Using A Three-dimensional Solid Model | International Journal of Technology 10 (2), 339, 0 | 1 |
| 26 | Is, 2008. Assembly Sequence Generation For Multidirectional And Orthogonal Of Product Based On Mating Location Point And Volume Of Components | Jurnal Teknik Industri 10 (2), 124-137, 0 | 2 |
| 27 | Advances In Manganese Oxide Research: Environmental Geochemistry To Biogeochemical Cycling And Sustainable Catalysis | environmental sciences 8 (9), 10-11, 2024 | 4 |
| 28 | Risk Analysis Of Machine Failure Factors In Engine Assembly Process At Pt. Automotive | AIP Conference Proceedings 2891 (1), 2024 | 0 |
| 29 | Proposal For Improvement Of The Inventory Control System Of Automotive Spare Parts At Pt Automotive Padang | AIP Conference Proceedings 2891 (1), 2024 | 0 |