| 1 | 5s Implementation To Minimize Waste In Bread Production Process (case Study: Madani Bakery) | Manufacturing Driving Circular Economy: Proceedings of the 18th Global …, 2023 | 0 |
| 2 | Innovative Multi-criteria Decision-making Approach For Supplier Evaluation: Combining Tlf, Fuzzy Bwm, And Vikor | Industrial Engineering Department. Engineering Faculty, Universitas Andalas …, 2023 | 2 |
| 3 | Evaluation And Design Public Facilities For People With Disabilities In Al-hakim Mosque, Indonesia | Andalasian International Journal of Applied Science, Engineering and …, 2022 | 1 |
| 4 | The Effectiveness Of Knowledge Sharing In Improving Student's Technopreneur Capabilities And Individual Innovation Behaviour | AIP Conference Proceedings 2433 (1), 2022 | 0 |
| 5 | Penilaian Maturity Level Sistem Manajemen Kinerja Pendidikan Tinggi Berdasarkan Critical Success Factors | INVENTORY: Industrial Vocational E-Journal On Agroindustry 3 (2), 54-61, 2022 | 0 |
| 6 | 5s Implementation To Minimize Waste In Bread Production Process (case Study: Madani Bakery) | Lecture Notes in Mechanical Engineering 1 (pertama), 357-363, 2022 | 0 |
| 7 | Ergonomic Evaluation On Chicken Feeder Tool At Egg-laying Chicken Farm Sme | Jurnal Optimasi Sistem Industri 20 (1), 52–60-52–60, 2021 | 4 |
| 8 | Improving Performance Of Outpatient Queuing System: A Simulation Based Case Study | IOP Conference Series: Materials Science and Engineering 1003 (1), 012088, 2020 | 1 |
| 9 | Model Hubungan Antar Pemangku Kepentingan Dalam Koordinasi Penanganan Bencana Di Kota Padang | Jurnal Optimasi Sistem Industri 18 (1), 48–54-48–54, 2019 | 12 |
| 10 | An Application Of Combined Fuzzy Mcdm Techniques In Structuring Disaster Resilience Indicators For Small And Medium Enterprises: A Case Study | 2019 IEEE 6th International Conference on Industrial Engineering and …, 2019 | 3 |
| 11 | Macro Ergonomics Approach Towards Haddon Matrix In Traffic Accident Prevention | INTERNATIONAL JOURNAL OF PROGRESSIVE SCIENCES AND TECHNOLOGIES 14 (2019), 2019 | 2 |
| 12 | Pelatihan Standar Penanganan Pangan Rendang Di Sentra Produksi Randang | Warta Pengabdian Andalas 26 (2), 112-116, 2019 | 0 |
| 13 | Reducing Bag Defects Using Six Sigma Methodology: A Case Study In A Cement Industry | 2018 7th International Conference on Industrial Technology and Management …, 2018 | 8 |
| 14 | Decision Support System For Inventory Control Of Raw Material (case Study: Pt Suwarni Agro Mandiri Plant Pariaman, Indonesia) | 2018 5th International Conference on Industrial Engineering and Applications …, 2018 | 3 |
| 15 | An Integrative Multi-criteria Decision Making Techniques For Supplier Evaluation Problem With Its Application | IOP Conference Series: Materials Science and Engineering 319 (1), 012076, 2018 | 3 |
| 16 | Decision Support System For Inventory Control Of Raw Material | Proceedings of 2018 5th International Conference on Industrial Engineering … | 1 |
| 17 | Optimizing Coal Blending Quality Through Supplier Selection And Order Allocation: A Case Of Cement Industry | MATEC Web of Conferences 204, 02005, 2018 | 1 |
| 18 | Key Performance Indicators Of Disaster Preparedness: A Case Study Of A Tsunami Disaster | MATEC web of conferences 229, 01010, 2018 | 24 |
| 19 | A Configuration System For Real-time Monitoring And Controlling Electricity Consumption Behavior | 2018 International Conference on Information Technology Systems and …, 2018 | 12 |
| 20 | Using Grey-fuzzy Programming Approach To Solve Multi-objective Supplier Selection Problem | 2017 4th International Conference on Industrial Engineering and Applications …, 2017 | 2 |
| 21 | Winter Performance Of A Naturally Ventilated Cavity Roof Of A Factory | Advanced Science Letters 23 (5), 3854-3858, 2017 | 0 |
| 22 | Identification Of Design Requirements For Ergonomic Long Spinal Board Using Quality Function Deployment (qfd) | Procedia Manufacturing 3, 4673-4680, 2015 | 37 |
| 23 | Fuzzy Multi-objective Supplier Selection Problem: Possibilistic Programming Approach | Industrial Engineering, Management Science and Applications 2015, 521-529, 2015 | 2 |
| 24 | "improving Service Quality Towards Patients’ Satisfaction At Stroke Hospitals In West Sumatera" | https://qir.eng.ui.ac.id/wp-content/uploads/2016/08/Qir-Proceeding-2015.pdf …, 2015 | 0 |
| 25 | Possibilistic Programming Model For Fuzzy Multi-objective Periodic Review Inventory In Two-stage Supply Chain | International Journal of Applied Decision Sciences 7 (2), 168-189, 2014 | 9 |
| 26 | Daily Planning For Three Echelon Logistics Considering Inventory Conditions | Journal of Advanced Mechanical Design, Systems, and Manufacturing 7 (3), 485-497, 2013 | 6 |
| 27 | 3b1 Possibilistic Programming Approach For Multi-objective Inventory Problem In Two-echelon Supply Chain System (technical Session 3b: Scm And Logistics 1) | Proceedings of International Symposium on Scheduling 2013, 68-73, 2013 | 0 |
| 28 | 3b1 Possibilistic Programming Approach For Multi-objective Inventory Problem In Two-echelon Supply Chain System (technical Sess... | Proceedings of International Symposium on Scheduling 2013, 68-73 | 0 |
| 29 | An Enhanced Two-phase Fuzzy Programming Model For Multi-objective Supplier Selection Problem | Industrial Engineering and Management Systems 11 (1), 1-10, 2012 | 1 |
| 30 | An Enhanced Two-phase Approach For Fuzzy Multi-objective Linear Programming In Supplier Selection Problem | Proceedings of APIEMS | 1 |
| 31 | Integrasi Taguchi Loss Function Dengan Fuzzy Analytical Hierarchy Process Dalam Pemilihan Pemasok | Jurnal Teknik Industri: Jurnal Keilmuan dan Aplikasi Teknik Industri 13 (2Â …, 2011 | 4 |
| 32 | 妥協的二段階手順に基づくファジィ多目的線形計画法を用いた供給者評 | 自動制御連合講演会講演論文集 第 54 回自動制御連合講演会, 404-404 | 0 |
| 33 | An Enhanced Two-phase Approach For Fuzzy Multi-objective Linear Programming In Supplier Selection Problem [a] | Proceedings of APIEMS, 2011 | 1 |
| 34 | 妥協的二段階手順に基づくファジィ多目的線形計画法を用いた供給者評 | 自動制御連合講演会講演論文集 第 54 回自動制御連合講演会, 404-404, 2011 | 0 |
| 35 | Multi-objective Analysis Of Periodic Review Inventory Problem With Coordinated Replenishment In Two-echelon Supply Chain System Through Differential Evolution | Journal of Advanced Mechanical Design, Systems, and Manufacturing 4 (3), 637-650, 2010 | 10 |
| 36 | Multi-objective Analysis Of Periodic Review Inventory Problem With Coordinated Replenishment In Two-echelon Supply Chain System | Proceedings of International Symposium on Scheduling 2009, 244-249, 2009 | 10 |
| 37 | Pengukuran Produktivitas Ptp. Nusantara Vi Unit Usaha Kayu Aro Dengan Metode Objective Matrix (omax) | - | 0 |
| 38 | 2018 7th International Conference On Industrial Technology And Management (icitm 2018) | - | 0 |
| 39 | Improving Service Quality Towards Patients' Satisfaction At Stroke Hospitals In West Sumatera | The 14th International Conference on QiR (Quality in Research), 1191-1196 | 0 |
| 40 | Structuring Disaster Resilience Attributes For Small And Medium Enterprises In Padang City–indonesia | - | 0 |
| 41 | Improving Service Ouality | - | 0 |
| 42 | Pengukuran Produktivitas Ptp. Nusantara Vi Unit Usaha Kayu Aro Dengan Metode Objective Matrix (omax) | - | 0 |
| 43 | Improving Service Ouality | - | 0 |
| 44 | Structuring Disaster Resilience Attributes For Small And Medium Enterprises In Padang City–indonesia | - | 0 |
| 45 | 2018 7th International Conference On Industrial Technology And Management (icitm 2018) | - | 0 |